AIRBUS | Delivery Hall C94

Missions

As part of its industrial and logistics activities, Airbus is developing a new facility, known as C94, at the Ziegler site in Toulouse. This project is designed to strengthen delivery security while supporting the operational needs of the Customer Line.

The project involves the construction of an aircraft hangar designed to accommodate two Single Aisle aircraft (A320/A321) and one Wide Body aircraft (A330/A350), with an operational configuration allowing up to three Single Aisle aircraft. The hangar is dedicated to light aircraft maintenance activities, including touch-ups, repairs, and inspections, in support of Customer Line operations. setec serige is providing multidisciplinary engineering and project management services for the following disciplines:

  • Structural Engineering (Concrete, Steel and Timber Structures)
  • Plumbing and Compressed Air Systems
  • HVAC
  • Building Performance and Energy Design
  • Fire Protection
  • Electrical Engineering (High and Low Voltage, Fire Detection and Alarm Systems)
  • External Works and Utilities (Roads and Networks)
  • Photovoltaic Power Generation
  • BIM Management

Expertises

Challenges

  • Exceptional 110 m clear span with no intermediate supports;
  • Clear height: 23.10 m beneath roof trusses and 20.67 m beneath crane hook;
  • 5-ton overhead travelling crane spanning 70 m;
  • 104 m aircraft door clear opening;
  • Multiple energy pits integrated into the floor slab, incorporating approximately 3 km of underground networks;
  • Stormwater and firewater retention basin with a capacity of 5,557 m³;
  • Enhanced fire protection systems, including roof and column sprinklers, a foam grate nozzle system for fuelled aircraft areas, and fire hose reels;
  • Construction of a dedicated fire protection facility featuring three large above-ground water storage tanks with a usable capacity of 3,690 m³.

Key figures

Project Timeline

  • Design: September 2025 – April 2026
  • Construction: July 2026 – September 2028

Areas

  • Aircraft Hangar: 10,000 m²
  • Offices and Support Facilities: 740 m²

Construction Cost

  • €48 million