AVIANCA | MRO El Dorado Airport Bogota

Missions

Construction of a line maintenance hangar with associated ancillary facilities: Engine workshop, Paint workshop, Composites workshop, Wheels and brakes workshop, Interiors workshop, Warehouse, Offices for 200 workstations, Technical center (High/Low Voltage, CFA, Fire protection, Domestic Hot Water)

 

Construction of a line maintenance hangar with associated ancillary facilities:

  • Engine workshop
  • Paint workshop
  • Composites workshop
  • Wheels and brakes workshop
  • Interiors workshop
  • Warehouse
  • Offices for 200 workstations
  • Technical center (High/Low Voltage, CFA, Fire protection, Domestic Hot Water)

 


 

setec serige is responsible for the detailed design of the following disciplines:

  • Aircraft interfaces
  • Aircraft power systems
  • Structure – Civil works
  • Site infrastructure (VRD)
  • HVAC systems (CVCD)
  • High voltage systems
  • Low voltage systems

Key figures

Surface Areas

  • Hangar: 13,200 m²
  • Offices and ancillary facilities: 15,200 m²

Project Cost

  • Phase 1: €31 million
  • Phase 2: €11 million